nitepjony
Active Member
- Joined
- Sep 2, 2025
- Threads
- 1
- Messages
- 27
- Reaction score
- 42
- Location
- Los Angeles, California
- Vehicle(s)
- 2024 Mustang GT Premium 401A
Oh yeah it was a huge pain, topside work with the cooler was simple and took less than an hour but all the bottom side work with the cooler lines took me 6 hours. Wouldn't do it again but I'm glad I finished it so that at least anyone else in the future who wants to do it can see what they're getting themselves into lolBTW, I read your posts about the upgrade, and I'm impressed you saw the whole project through. I don't know that I would have had the fortitude to complete that. LOL
Sponsored