Sponsored

2024+ Mustang S650 Orders Tracking List & Stats [Enter Yours!]

Dub347sbf

Well-Known Member
Joined
Aug 2, 2013
Threads
41
Messages
1,269
Reaction score
1,235
Location
Texas
Vehicle(s)
2024 Mustang Dark Horse
didn’t you say you never got a vin either? Did you get your acknowledgment email from ford?
I don't have a VIN, It's a little different for specialty cars like Dark Horse, they are manually allocated. My dealership got 3 for the year. They pulled their first one in June for August build, but could not schedule one with the Handling Package, so my order got skipped. I'm hoping the next allocation can build with the HP, I have no idea when they will get their second allocation. I'm hoping October or November, since they haven't built the HP from December through March historically on the Mach 1, due to temps being to cold for the Cup 2 tires. I assume the Trofeo RS tires will have the same limitation.

I was prepared for the wait after following the Mach 1 sagas from 2021 until now, but it doesn't make it suck less that if I dont get built by December, I'll probably be well over a year from ordering to receiving the car.
Sponsored

 
Last edited:

Stratman397

Well-Known Member
Joined
Jul 30, 2023
Threads
23
Messages
1,415
Reaction score
519
Location
Seneca,SC
Vehicle(s)
2018 jeep grand Cherokee, 2006 rubicon
I don't have a VIN, It's a little different for specialty cars like Dark Horse, they are manually allocated. My dealership got 3 for the year. They pulled their first one in June for August build, but could not schedule one with the Handling Package, so my order got skipped. I'm hoping the next allocation can build with the HP, I have no idea when they will get their second allocation. I'm hoping October or November, since they haven't built the HP from December through March historically on the Mach 1, due to temps being to cold for the Cup 2 tires. I assume the Trofeo RS tires will have the same limitation.

I was prepared for the wait after following the Mach 1 sagas from 2021 until now, but it doesn't make it suck less that if I dont get built by December, I'll probably be well over a year from ordering to receiving the car.
Wow! Well sure hope you don’t have to wait a lot longer.
 

Zig

Well-Known Member
Joined
Jul 21, 2023
Threads
36
Messages
4,611
Reaction score
2,493
Location
Virginia
Vehicle(s)
‘24 F350 cclb drw fx4 6.7ho, ‘24 gt pp, ‘05 c6 f55, ‘01 fatboy, ‘03 sprtstr
a reply in this thread to let us know
 

Jrws1014

Well-Known Member
Joined
Jun 3, 2023
Threads
30
Messages
572
Reaction score
462
Location
North Carolina
Vehicle(s)
2019 Mustang Ecoboost Premium Convertible
I hope you nor me has to wait any 9 mos to get ours. I keep looking online, and if one comes up that is exact,y what I ordered, I may just take it. Not a lot of manual convertibles coming up though. See some have dark horses coming in, but not sure what yours has in it
My dealer has a race red GT Premium convertible coming in with red interior and bronze package and active exhaust with a manual transmission. Located in NC
 

dliddie

Member
Joined
Aug 16, 2023
Threads
0
Messages
22
Reaction score
23
Location
Dallas Texas
Vehicle(s)
Genesis G70
I don't have a VIN, It's a little different for specialty cars like Dark Horse, they are manually allocated. My dealership got 3 for the year. They pulled their first one in June for August build, but could not schedule one with the Handling Package, so my order got skipped. I'm hoping the next allocation can build with the HP, I have no idea when they will get their second allocation. I'm hoping October or November, since they haven't built the HP from December through March historically on the Mach 1, due to temps being to cold for the Cup 2 tires. I assume the Trofeo RS tires will have the same limitation.

I was prepared for the wait after following the Mach 1 sagas from 2021 until now, but it doesn't make it suck less that if I dont get built by December, I'll probably be well over a year from ordering to receiving the car.
Man I'm sorry to hear that. I ordered mine on 04.01.23 in Dallas as well. Its a very similar spec as yours, but its still showing in production. I hope to have it some time in September. They produced my VIN early this month. Also are you apart of any clubs in the DFW. I am thinking about finding one to join.

S650 Mustang 2024+ Mustang S650 Orders Tracking List & Stats [Enter Yours!] Order Screen Shot 2
 


Stratman397

Well-Known Member
Joined
Jul 30, 2023
Threads
23
Messages
1,415
Reaction score
519
Location
Seneca,SC
Vehicle(s)
2018 jeep grand Cherokee, 2006 rubicon
I don't have a VIN, It's a little different for specialty cars like Dark Horse, they are manually allocated. My dealership got 3 for the year. They pulled their first one in June for August build, but could not schedule one with the Handling Package, so my order got skipped. I'm hoping the next allocation can build with the HP, I have no idea when they will get their second allocation. I'm hoping October or November, since they haven't built the HP from December through March historically on the Mach 1, due to temps being to cold for the Cup 2 tires. I assume the Trofeo RS tires will have the same limitation.

I was prepared for the wait after following the Mach 1 sagas from 2021 until now, but it doesn't make it suck less that if I dont get built by December, I'll probably be well over a year from ordering to receiving the car.
But, why can’t they build them if they are going to states where it seldom ever gets to freezing?
 

Dub347sbf

Well-Known Member
Joined
Aug 2, 2013
Threads
41
Messages
1,269
Reaction score
1,235
Location
Texas
Vehicle(s)
2024 Mustang Dark Horse
Man I'm sorry to hear that. I ordered mine on 04.01.23 in Dallas as well. Its a very similar spec as yours, but its still showing in production. I hope to have it some time in September. They produced my VIN early this month. Also are you apart of any clubs in the DFW. I am thinking about finding one to join.

Order Screen Shot 2.webp
I'm actually in Texas but not in Dallas. Congrats on your car, not sure about the clubs down in Dallas, but i do plan on checking out Eagle Canyon Raceway there at some point!

But, why can’t they build them if they are going to states where it seldom ever gets to freezing?
I don't know for sure, but I assume it's because temps below 35 will damage the compound on the Michelin Cup 2 tires. They are very very soft track tires. The regular Mach 1 and GT PP don't have this requirement, but you are not even supposed to have the weight of the car on the cup 2s in temps at 35 and below, and they are manufactured at Flat Rock which gets much colder than that in those months. Don't want to ship a track tire that could be dangerous to run at high speeds. Ford even states in the manual not to use the tires below 45 degrees. I am assuming the Trofeo RS will have the same limitation.

Here is some reading about storing competition tires in cold temps
https://www.tirerack.com/upgrade-ga...ck-competition-dot-tires-in-cold-temperatures

Here is a note from the cup 2 page
Note: Michelin Pilot Sport Cup 2 R tires should be stored at temperatures above 32°F (0°C). Below 14°F (-10°C) the tires should not be used, stored, moved or shipped. Lower temperatures can cause the rubber to crack. Cold compound cracking occurs as a result of improper use or storage, and therefore Michelin's warranty will not cover tires exhibiting this condition. Any tires exhibiting compound cracking must be replaced.
 
Last edited:

Stratman397

Well-Known Member
Joined
Jul 30, 2023
Threads
23
Messages
1,415
Reaction score
519
Location
Seneca,SC
Vehicle(s)
2018 jeep grand Cherokee, 2006 rubicon
My dealer has a race red GT Premium convertible coming in with red interior and bronze package and active exhaust with a manual transmission. Located in NC
Thanks, but we also got performance package, active e haunt, 401A, but we really want blue. Now if they don’t get me scheduled for October, I will probably find one at a dealer and cancel mine. I wish the dealer would never have messed my order up
I'm actually in Texas but not in Dallas. Congrats on your car, not sure about the clubs down in Dallas, but i do plan on checking out Eagles Canyon Raceway there at some point!


I don't know for sure, but I assume it's because temps below 35 will damage the compound on the Michelin Cup 2 tires. They are very very soft track tires. The regular Mach 1 and GT PP don't have this requirement, but you are not even supposed to have the weight of the car on the cup 2s in temps at 35 and below, and they are manufactured at Flat Rock which gets much colder than that in those months. Don't want to ship a track tire that could be dangerous to run at high speeds. Ford even states in the manual not to use the tires below 45 degrees. I am assuming the Trofeo RS will have the same limitation.

Here is some reading about storing competition tires in cold temps
https://www.tirerack.com/upgrade-ga...ck-competition-dot-tires-in-cold-temperatures

Here is a note from the cup 2 page
thank you! Wonder why they put summer tires only on them?
 

jamespmoran

Well-Known Member
Joined
Aug 7, 2023
Threads
4
Messages
182
Reaction score
186
Location
Bloomer, WI
Vehicle(s)
2022 F-150, 2020 Explorer ST, 2004 Thunderbird
Ordered 8/12, GT Premium Convertible, 401a, 3.55 rear axle, auto, active valve exhaust, engine block heater, received build date today 8/17, build date 10/2. Wooohooo.
 

Diocletian

Well-Known Member
Joined
Jun 11, 2018
Threads
0
Messages
118
Reaction score
14
Location
Orlando, Florida
Vehicle(s)
'18 OF Mustang GT Premium. '22 Hyundai Santa Cruz
Received build date today: 10/9!

S650 Mustang 2024+ Mustang S650 Orders Tracking List & Stats [Enter Yours!] 20230817_104320
 

Stratman397

Well-Known Member
Joined
Jul 30, 2023
Threads
23
Messages
1,415
Reaction score
519
Location
Seneca,SC
Vehicle(s)
2018 jeep grand Cherokee, 2006 rubicon
Ordered 8/12, GT Premium Convertible, 401a, 3.55 rear axle, auto, active valve exhaust, engine block heater, received build date today 8/17, build date 10/2. Wooohooo.
What priority code were you? I ordered mine June 7, but they put down the code wrong so when I went back and had them change it to the right code that was the end of July, so it threw me back eight weeks and mine is still waiting to be built. They even change my priority code from 19 to 10
 

jamespmoran

Well-Known Member
Joined
Aug 7, 2023
Threads
4
Messages
182
Reaction score
186
Location
Bloomer, WI
Vehicle(s)
2022 F-150, 2020 Explorer ST, 2004 Thunderbird
What priority code were you? I ordered mine June 7, but they put down the code wrong so when I went back and had them change it to the right code that was the end of July, so it threw me back eight weeks and mine is still waiting to be built. They even change my priority code from 19 to 10
I was a 19 priority
Sponsored

 





Top