aross99

Active Member
Joined
May 24, 2019
Threads
1
Messages
25
Reaction score
12
Location
East Lansing, MI
Vehicle(s)
Previous Mustangs: 1983 GT, 1985 SVO, 2019 GT
Any idea if this includes Dark Horse models - specifically those with the handling pack? I remember reading somewhere that the models with track tires (GT500, Mach1 with handling pack, and DH w/handling pack) arenā€™t in production from November thru March?
 

JediMindTrix

Well-Known Member
Joined
Aug 9, 2023
Threads
6
Messages
278
Reaction score
318
Location
Michigan
Vehicle(s)
S650 GT, P702 XLT, P758 XL
Any idea if this includes Dark Horse models - specifically those with the handling pack? I remember reading somewhere that the models with track tires (GT500, Mach1 with handling pack, and DH w/handling pack) arenā€™t in production from November thru March?
To piggyback off of this; is anyone aware of the average Dark Horse Handling Pack order-to-delivery time based on 24MY experiences? I'm sure it's all over but trying to gauge how much time is relevant.
 

Skye

Well-Known Member
Joined
Jul 29, 2022
Threads
0
Messages
1,065
Reaction score
1,499
Location
ā‰ˆ39N
Vehicle(s)
"Skye" Mach1 N2144
models with track tires (GT500, Mach1 with handling pack, and DH w/handling pack) arenā€™t in production from November thru March?
That is correct. Generally, from as soon as October. I've. seen HP-like cars arrive in Owner's hands as quickly as April (previous MYs) the following year. It's the Summer tires, Ford wanting to prevent any damage due to cold temps.
 

Mustang Bob

Member
Joined
Nov 2, 2018
Threads
0
Messages
16
Reaction score
18
Location
Sydney, Australia
Vehicle(s)
2019 Mustang GT
Hi guys, sorry but I'm a bit slow on the uptake... Based on the chart above, when would you expect the last MY24 car to come off the production line? I live in Australia and our 1st deliveries of S650s only started last week (yes, we've had to wait 2 years) with a heap of cars still to be built. With color changes and price rises for '25, there could well be some very unhappy customers down under! TIA Cheers......
 


aross99

Active Member
Joined
May 24, 2019
Threads
1
Messages
25
Reaction score
12
Location
East Lansing, MI
Vehicle(s)
Previous Mustangs: 1983 GT, 1985 SVO, 2019 GT
That is correct. Generally, from as soon as October. I've. seen HP-like cars arrive in Owner's hands as quickly as April (previous MYs) the following year. It's the Summer tires, Ford wanting to prevent any damage due to cold temps.
So based on this issue, and on Job 1 starting in NOVEMBER, we should not expect these models to be SCHEDULED until MARCH/APRIL of 2025?
 

roket

Well-Known Member
Joined
Sep 22, 2022
Threads
49
Messages
1,458
Reaction score
2,190
Location
Cave Creek, Arizona
Website
roket333.github.io
Vehicle(s)
2024 Ford Mustang Dark Horse
That is correct. Generally, from as soon as October. I've. seen HP-like cars arrive in Owner's hands as quickly as April (previous MYs) the following year. It's the Summer tires, Ford wanting to prevent any damage due to cold temps.
my Dark Horse HP was delivered in September of 2023 and i ordered in March 2023
 

Skye

Well-Known Member
Joined
Jul 29, 2022
Threads
0
Messages
1,065
Reaction score
1,499
Location
ā‰ˆ39N
Vehicle(s)
"Skye" Mach1 N2144
So based on this issue, and on Job 1 starting in NOVEMBER, we should not expect these models to be SCHEDULED until MARCH/APRIL of 2025?
I can't say how far ahead Ford would commit to a build/schedule, but yes, I would not expect the car to be completed and readied for shipment until March/April of '25.

The following is an extreme example, but it highlights what Ford is trying to avoid.

https://www.mustang7g.com/forums/threads/trofeo-rs-tires-cracked-from-shipping.159921/
 
Last edited:

snakeyes

Well-Known Member
Joined
Mar 15, 2023
Threads
8
Messages
275
Reaction score
174
Location
NC
Vehicle(s)
2024 GT Premium, PP, A10
šŸ¤£šŸ¤£šŸ¤£
They canā€™t build 24ā€™s and theyā€™re starting on 25ā€™s Come on Manā€¦?
 

Bluember24

Well-Known Member
Joined
Jul 22, 2024
Threads
0
Messages
50
Reaction score
66
Location
Scottsdale, Arizona
Vehicle(s)
2024 DH HP, 2004 MSM Miata
I ordered a Dark Horse Handling Pack in early September that was still processing in June. Found one somewhere else so not sure if it ever got built.
 

Radiant

Well-Known Member
Joined
Apr 22, 2024
Threads
1
Messages
323
Reaction score
302
Location
East Coast - United States
Vehicle(s)
2024 Ecoboost Premium Convertible
What is Job 1 Production?
Organization of batches throughout the year. They start on Job 1, if anything changes, that next batch is Job 2, and so on.
 

SlamForce

Member
Joined
Jan 31, 2021
Threads
0
Messages
5
Reaction score
1
Location
San Jose
Vehicle(s)
2022 Explorer ST
What about 2024 Darkhorses ordered in May? Will they ever be built?
 

Skye

Well-Known Member
Joined
Jul 29, 2022
Threads
0
Messages
1,065
Reaction score
1,499
Location
ā‰ˆ39N
Vehicle(s)
"Skye" Mach1 N2144
What about 2024 Darkhorses ordered in May? Will they ever be built?
We've still got this month, September, maybe a bit of October. I'd reach back to the dealer, see if they can confirm the order is paired with an allocation, discuss the what-ifs.

Towards the start of last Fall, Ford sent out a message when they cancelled the remaining, unbuilt DH HP orders for that Calendar Year. I suspect they'd do the same this CY.

Edit,

One thread tracking the DH HP build cancellations, last Fall.

https://www.mustang7g.com/forums/threads/dark-horse-order-fail-news-letter-from-ford.159369/
 
Last edited:

aross99

Active Member
Joined
May 24, 2019
Threads
1
Messages
25
Reaction score
12
Location
East Lansing, MI
Vehicle(s)
Previous Mustangs: 1983 GT, 1985 SVO, 2019 GT
I can't say how far ahead Ford would commit to a build/schedule, but yes, I would not expect the car to be completed and readied for shipment until March/April of '25.

The following is an extreme example, but it highlights what Ford is trying to avoid.

https://www.mustang7g.com/forums/threads/trofeo-rs-tires-cracked-from-shipping.159921/
I spoke to my dealer yesterday, and the inventory manager confirmed that they would not be building cars with track tires during that time frame, so the earliest my car could be built would be March/April 2025. He did say they should not cancel the orders, and that they should stay in the system until that time.