Sponsored

2025 Mustang Scheduling This Week (11/21/24) for Production Weeks 12/30-1/27

Newface

Well-Known Member
Joined
Mar 13, 2023
Threads
123
Messages
135
Reaction score
323
Location
Usanda
Vehicle(s)
Lotsodem
Notes:
• Production Weeks: 12/30 - 1/27.
• Main Commit.
- The Dark Horse Handling Package (67P) won't be available until April 2025.
- The Mustang Nite Pony Package (60G) with the Black Painted Roof is available only for retail scheduling. For stock orders, the vehicle must have black exterior paint.

Limited Availability:
⭐ - 99F - 5.0L Ti-VCT V8 Engine with Stop/Start System

Very Limited to Exhausted:
⭐ - 99H - 2.3L EcoBoost Engine with Stop/Start System

S650 Mustang 2025 Mustang Scheduling This Week (11/21/24) for Production Weeks 12/30-1/27 US Ford Scheduling Notes - 11.18.24-1


S650 Mustang 2025 Mustang Scheduling This Week (11/21/24) for Production Weeks 12/30-1/27 US Ford Scheduling Notes - 11.18.24-2
Sponsored

 
 








Top