Sponsored

2025 Mustang Scheduling This Week (10/24/24) for Production Weeks 12/2 - 12/16

Newface

Well-Known Member
Joined
Mar 13, 2023
Threads
123
Messages
135
Reaction score
323
Location
Usanda
Vehicle(s)
Lotsodem
Notes:
• Production Weeks: 12/2 - 12/16.

• Main Commit
- The Dark Horse Handling Package (67P) won't be available until April 2025.
- The Mustang Nite Pony Package (60G) with the 43S Black Painted Roof is only available for retail scheduling and is currently not eligible for stock dressing

• Limited Availability:
⭐ - Mustang GT Fastback RWD/5.0L Ti-VCT V8 Engine/10-speed SelectShift Automatic Transmission
- 19" X 8.5" Sinister Bronze Painted Wheels (64S) Inc Bronze Appearance Pkg (60L) Avail on (201A/401A)

• Very Limited to Exhausted Availability:
⭐ - 19” X 9.5” (F) 19” X 10” Tarnished Dark-painted Low Gloss Aluminum (64R) Standard on 600A and 700A

S650 Mustang 2025 Mustang Scheduling This Week (10/24/24) for Production Weeks 12/2 - 12/16 US Ford Scheduling Notes - 10.21.24-1


S650 Mustang 2025 Mustang Scheduling This Week (10/24/24) for Production Weeks 12/2 - 12/16 US Ford Scheduling Notes - 10.21.24-2


S650 Mustang 2025 Mustang Scheduling This Week (10/24/24) for Production Weeks 12/2 - 12/16 US Ford Scheduling Notes - 10.21.24-3
Sponsored

 
 








Top