If you’ve been scheduled you’re fine. This list looks at all orders in the order back. So those who have submitted an order and not been scheduled are also included in this graphic, and they are the ones who will be waiting longer.According to the dealer, my car is scheduled to be built on 8/7. I have the NPP and the PP, so I'm taking what they're telling me with a grain of salt.
first column is % of mustangs that can be made (ie 50% can be GT) the second column is %on order (ie 19% of orders are GT). the last column is the difference between the twoCan someone please explain what this graphic is saying?
Black painted roof is a part of NPP that isnt included on black cars, so its listed as a component thereWhat is the distinction between NPP and black painted roof?
It is dealers and retail orders dropping the NPP. Their capacity has not increased.Looks like the NPP option is getting closer to Ford having availability full. Several week ago, the difference was -4%, this week it's only -1%. Though it makes me wonder if it is more due to people following through on Ford's recommendation to drop it in order to get their car scheduled rather than actually having the parts to build the NPP.
Unfortunately, the black painted roof is still -28% overall, though it did go up to -28% from -29% on 7/17:
The painted roof is the total for all ordered with the black painted roof that is different than the body color. Usually as a part of an option, such as part of the NPP and Dark Horse Appearance Packages. The NNP Separates out the option separately. So in effect, all NPP are part of the Black Painted Roof total, but not all Black Painted Roofs are included in the NPP total.What is the distinction between NPP and black painted roof?
i ordered my pre eco boot NP convertible in yellow june 23 was scheduled july 15 for sept 28 production no window sticker yet thoughI ordered my base, manual GT with Nite pony over 2 months ago. It still hasn't been scheduled to be built and they can give me 0 updates. Getting ridiculous.
You won't get a window sticker till Sept. When your Eco goes into production.i ordered my pre eco boot NP convertible in yellow june 23 was scheduled july 15 for sept 28 production no window sticker yet though