I'm afraid you have lost me now.
First UK customer cars will be before July. It takes 6 to 8 weeks from build to delivery, so if you really have a VIN and scheduled car being built in early April, it will arrive in the UK late May / early June. If you have the VIN and contract number you will...
I have an email from the dealer confirming my order and 'contract number'. Ford also prompted my dealer to add the 'upgrade and save' deal when the order was put through.
I don't understand what you have said above? You say your order was rejected and bumped to a factory order, so how can you...
Those two sentences don't mean the same thing! There were more than 12 cars in the first batch available (which included dealer demo cars)
12 confirmed orders (of which mine was one) doesn't mean all of those 12 had VIN's (mine doesn't) and a predicted build date is not a scheduled build date...
My order was confirmed on 02/02/24 and it didn't have a VIN at the time. The only orders being accepted at that point were for the preconfigured cars.
If you are saying your car has a VIN it is already scheduled, so must be being built in the first 2 weeks of April, as they haven't scheduled...
My order is definitely one of the first batch with the spec fixed by Ford. They were not scheduled at the time of my order in early February - specifically says that on the order.
If you have a VIN then your build is scheduled with a build date already in the system.
Scheduling takes place...
Don't think so? I have seen the information for my car and they were not scheduled (serialised) in February. If you have just got a VIN then it was scheduled two weeks ago and they were scheduling for the first 2 weeks of April then. There was no scheduling last week for Mustang at all.
My...
Have you actually driven an S650 to give those strong opinions? Plus the hood vents - is it not possible that Ford may have got them right :wink: .
It's easy to be a keyboard warrior, but it helps if you actually have proper information rather than 'opinions'.
Mine is estimated for production in April, so delivery late May / Early June. Will know pretty soon if that is the case as will need to be scheduled very soon if for April production