cbcarguy
Member
- Joined
- Jun 29, 2026
- Threads
- 7
- Messages
- 17
- Reaction score
- 12
- Location
- Central Florida
- Vehicle(s)
- 2026 Mustang GT (scheduled week of 6/29)
- Thread starter
- #1
Car was built July 1st
First ETA was July
Second ETA was August
Now the third ETA is Septemberā¦.
No answer on what is delaying it , dealership has no knowledge either
Itās supposed to be shipped to Louisville KY by convoy
This anticipation is killing me
Build is a 2026 GT 301A with the nite pony package , active valve exhaust in vapor blue with the 10 speed.
Anyone else have their Mustang get delayed this much? Iāve never ordered a car from the factory before so this is all new to me
First ETA was July
Second ETA was August
Now the third ETA is Septemberā¦.
No answer on what is delaying it , dealership has no knowledge either
Itās supposed to be shipped to Louisville KY by convoy
This anticipation is killing me
Build is a 2026 GT 301A with the nite pony package , active valve exhaust in vapor blue with the 10 speed.
Anyone else have their Mustang get delayed this much? Iāve never ordered a car from the factory before so this is all new to me
Sponsored