Newface
Well-Known Member
- Thread starter
- #1
Notes:
• Production Weeks: 7/1 - 7/29.
• Dressing period Retail Scheduling
Important:
- The 60G Mustang Nite Pony Package with the 43S Black Painted Roof is only available for retail scheduling and is currently not eligible for stock dressing.
- To speed up the scheduling of orders with the Nite Pony package (60G), we encourage the dealers to modify their orders by selecting the Shadow Black Paint (G1)
- Dealers with open allocation for Dark Horse should consider selecting the (64R) 19” X 10.5” (F)/19” X 11” (R) Carbon Fiber Wheel to avoid dealys in scheduling.
Limited Availability:
- 60G Mustang Nite Pony Package
• Production Weeks: 7/1 - 7/29.
• Dressing period Retail Scheduling
Important:
- The 60G Mustang Nite Pony Package with the 43S Black Painted Roof is only available for retail scheduling and is currently not eligible for stock dressing.
- To speed up the scheduling of orders with the Nite Pony package (60G), we encourage the dealers to modify their orders by selecting the Shadow Black Paint (G1)
- Dealers with open allocation for Dark Horse should consider selecting the (64R) 19” X 10.5” (F)/19” X 11” (R) Carbon Fiber Wheel to avoid dealys in scheduling.
Limited Availability:
- 60G Mustang Nite Pony Package
Sponsored