Rates have had pretty crazy volatility over the last year.
we are in a credit tightening cycle as of now. No one knows where will be 60-90 days out.
anything under 8% will be good. Plan for that.
But at such high base rates a half a point up or down doesnāt make much difference.
Side noteā¦...
I actually work in paint, we donāt do black roofs but the system wouldnāt likely work at production speed⦠these things are being painted in under a minute 67/hour. Iām sure they get shot in the base color and roof would be offline.
If itās like the bronco plant we have a MOD center where vehicles post build go for ācustom modsā so they may get assembled with the black badges etc⦠and then would have the roof painted black over in MOD.
Reading all the people beg for the tremec⦠maybe it is a tremec problem and they donāt have the production capabilities for 10s of thousands of units per year?
Itās not about patience, more about timeline. The whole point was to get the car before theyāre everywhere and have a summer of shxtting on people in the new new 5.0
that window has closed for us without a build date. By next summer Iāll just be another scrub in a mustang.
Just checked and still unscheduled clean, NP GT.
I feel like a fxcking clown shoe for ordering NP on 3/27 and thinking it would be no big deal.
Looks like Iām stuck cruising this old POS all summer now.