• Welcome to Mustang7G!

    If you're joining us from Mustang6G, then you may already have an account here!

    As long as you were registered on Mustang6G as of March 10, 2021 or earlier, then you can simply login here with the same username and password!

2025 Mustang Scheduling This Week (1/16/25) for Production Weeks 3/3 - 3/24/25

Newface

Well-Known Member
Joined
Mar 13, 2023
Threads
121
Messages
133
Reaction score
319
Location
Usanda
Vehicle(s)
Lotsodem
Notes:
• Production Weeks: 3/3-3/24.
• Dressing period for OTD Fitness.
• Retail scheduling only.
• The Dark Horse Handling Package (67P) won't be available until April 2025
• The Mustang Nite Pony Package (60G) with the Black Painted Roof is available only for retail scheduling. For stock orders, the vehicle must have black exterior paint. Very Limited to Exhausted Availability:
⭐ - 644 - "19” X 9” (F) 19” X 9.5” (R).Machined with Tarnished Dark Aluminum.
⭐ - 64Z - 19x9 (F)/19x9.5 (R) Sinister Bronze Painted.

S650 Mustang 2025 Mustang Scheduling This Week (1/16/25) for Production Weeks 3/3 - 3/24/25 US Ford Scheduling Notes - 1.13.25-1


S650 Mustang 2025 Mustang Scheduling This Week (1/16/25) for Production Weeks 3/3 - 3/24/25 US Ford Scheduling Notes - 1.13.25-2
Sponsored

 

DT-GT

Well-Known Member
Joined
Apr 28, 2023
Threads
4
Messages
137
Reaction score
112
Location
Colorado
Vehicle(s)
2022 Mustang
Thanks for the info and insights!! Greatly appreciated!!!
 

Cdub

Member
Joined
Nov 4, 2024
Threads
0
Messages
9
Reaction score
3
Location
Denver, US Colorado
Vehicle(s)
Dark Horse premium
Thanks for this! Any update on the DH scheduling 700A Performance package? Cant recall if mine is 67P (assume so)
Sponsored

 
 








Top