• Welcome to Mustang7G!

    If you're joining us from Mustang6G, then you may already have an account here!

    As long as you were registered on Mustang6G as of March 10, 2021 or earlier, then you can simply login here with the same username and password!

Search results

  1. Unofficial 2025 60th Anniversary Edition Mustang Registry

    Yes, mine was delivered from the factory with them two weeks ago.
  2. Unofficial 2025 60th Anniversary Edition Mustang Registry

    Delivered from the factory with red hub caps. The car was built March 20th but didn't ship until April 20th. The dealer said it was waiting the red hub caps. I thought it BS at the time, but apparently not.
  3. Unofficial 2025 60th Anniversary Edition Mustang Registry

    Thanks rocket. No Brembos for me either. I opted for a spare tire over a can of spray gunk.
  4. Unofficial 2025 60th Anniversary Edition Mustang Registry

    Having trouble uploading photos. Not sure why?
  5. Unofficial 2025 60th Anniversary Edition Mustang Registry

    Having trouble uploading tonight. Will give it another try tomorrow.
  6. Unofficial 2025 60th Anniversary Edition Mustang Registry

    Finally arrived at the dealer today! (of course I am out of town on business so can't pick it up until Saturday 😞) #887, Convertible, Wimbledon White, Carmine Red, 6 Speed, 401A, Active Exhaust, B&O, ...and Red Hub Caps! Was built on March 20th but not shipped until April 17, apparently...
  7. Maintenance intervals

    I have had Coyote engines dating back to 2012, and have found the oil life monitor to be quite intuitive. In my F150 it will range between 16,000 Km when doing a lot of summer highway driving and 8,000 Km when doing a lot of start/stop city driving. The Mustang gets an oil change once per year...
  8. “Steering Assist Fault - Service Required”

    I have had this happen with my F150. To your point, it seemed to be driven by an action I was performing at the time. Has not happened since. I would ignore unless it starts occurring on a regular basis.
  9. Anyone Get Scheduled for March???

    Happy for you!
  10. Unofficial 2025 60th Anniversary Edition Mustang Registry

    That is what I suspect too. That or held up over the tariff situation. It's a bit annoying that they just don't say that.
  11. Unofficial 2025 60th Anniversary Edition Mustang Registry

    My blend date was March 20. Vehicle still in Detroit showing in production as of today. Dealer tells me it is held waiting the red centre caps
  12. Unofficial 2025 60th Anniversary Edition Mustang Registry

    My 60th Anniversary was built on the 20th but my dealer advised yesterday that it is still at the plant waiting to be loaded in a railcar waiting on the red centre caps. If they ship with or without the red ones, they have been told that the black ones will eventually be replaced by Ford once...
  13. 60th Anniversary edition

    I am. Good Year to be one too 😀
  14. 60th Anniversary edition

    Agree, would check on allocation. I ordered mine the first time in July, but my dealer didn't get allocation. Canadian dealers only found out in October who would get allocation. Only one per dealer max and not every dealer was allocated one. Fortunately I was able to find a dealer that...
  15. 60th Anniversary edition

    248 being built for Canada scheduled March and April. Mine went into production yesterday in the first batch. Will be interesting to see how the Tariff war impacts the second batch. Brittany Blue was US only.
  16. Anyone Get Scheduled for March???

    After two setbacks due to tariffs, mine went into production today for a build next week. Looks like it will make it to Canada before the April tariffs kick in.
  17. Ordered 2025 ecoboost premium convertible molten magenta 12/28/24 waiting on build date

    Ugh! My 60th Anniversary GT Convertible, orded in October, originally scheduled week of Feb 24, then March 10, and as of today now March 17. Probably because of all this Tariff BS. 30 day reprieve for the auto mfgs yesterday. Need it built and across the border before they kick in 30 days...
  18. Ordered 2025 ecoboost premium convertible molten magenta 12/28/24 waiting on build date

    Build dates are sliding back. In January was advised scheduled week of Feb 24. Friday advised this had fallen back two weeks to week of March 10.
  19. Anyone Get Scheduled for March???

    Ugh! Checked this weekend and my build week has moved from February 24 to March 10. The wait is difficult (first ordered in July) though at least when it arrives we will be out of winter and I will be able to drive it. Had been hoping though that it would have been built and on its way...





Top